If a project is solo does it have to be Proof Listened to before it goes into the domain as completed?
TYIA
Solo project
I have a problem. Second time, solo closes (post completed) before I finish the PL..this time 3 sections left without my pl. I am fast as DPL; I check every day (sometimes more than once if I see fast recording), but this person signs off after his reading is complete. Any suggestions?
Helen
POW/MIA, we will remember them.
5/4/66 (S.V.) Malone, Jimmy M.
Private U.S. Army, 1st Battalion, 503rd Infantry
POW/MIA, we will remember them.
5/4/66 (S.V.) Malone, Jimmy M.
Private U.S. Army, 1st Battalion, 503rd Infantry
The MW was locked/gone. I just received contact at the project site Librivox admin. I hope this gets settled.
I will keep you updated.
Thank you again.
I will keep you updated.
Thank you again.
Helen
POW/MIA, we will remember them.
5/4/66 (S.V.) Malone, Jimmy M.
Private U.S. Army, 1st Battalion, 503rd Infantry
POW/MIA, we will remember them.
5/4/66 (S.V.) Malone, Jimmy M.
Private U.S. Army, 1st Battalion, 503rd Infantry
-
- LibriVox Admin Team
- Posts: 38572
- Joined: April 3rd, 2008, 3:55 am
- Location: Melbourne,Australia
That can happen if the MCs finger slips on a drop down menu (I know, it happened to me ) I'm sure it will be sorted soon. There are a number of statuses for a project - open , fully subscribed, prooflistening, validation, complete , on hold , abandoned and the last 4 block the MW access. But they are all MC reversible
Anne
Anne